Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Câble C1: Pointe du Lac - Limeil-Brévannes - Valenton - La Végétale - Villa Nova



General information  
Place Paris 
resort ?? 
Region Île-de-France 
Country   
Name of lift Câble C1: Pointe du Lac - Limeil-Brévannes - Valenton - La Végétale - Villa Nova 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2023/25 
Commissioning date 13 dic 2025 


Infos for handicapped persons
fully accessible

Characteristics
garage in Limeil-Brévannes

geometric data  
Height of valley station ?? m
Height of mountain station ?? m
Vertical rise ?? m
Route distance 4500 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 30 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 (2000) Pers/h
Travel time 18 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model Omega V - 10 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 105 (130) Stk
Cab distance 135,0 (108,0) m
Cab interval 22,5 (18,0) s
Garage type ground floor 
Garage place Middle station(s) 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 18 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control yes 
Autonomous ropeway ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 30 ott 2025
PHOTOS: ??

Lift-Statistics
358 visit(s) since 30 ott 2025
Last visit 3 dic 2025

LIFT-WORLD IDs
Lift-ID: 26050
Place-ID: 1159

https://www.seilbahntechnik.net/en/lifts/26050/datas.htm