Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Zauchenseebahn (Rosskopf)










General information  
Place Zauchensee 
resort ?? 
Region Salzburg 
Country   
Name of lift Zauchenseebahn (Rosskopf) 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1996 
Commissioning date 1996 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Middlestation

geometric data  
Height of valley station 1353,9 m
Height of middle station(s) 1759 m
Height of mountain station 1930,45 m
Vertical rise 576,50 m
Route distance 2171,30 m
Horizontal length 2074,60 m
Average incline 27,80 %
Largest incline 69,90 %
Number of pillars 19 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,5 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2600 Pers/h
Travel time 7,24 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) 1060 kW
Drive power (Operation) 950 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model OMEGA 8s 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 97 Stk
Cab distance 55,38 m
Cab interval 11,08 s
Garage type underground 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 47 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 29/01/24
PHOTOS: ??

Lift-Statistics
27117 visit(s) since 16/06/03
Last visit 19/03/24

LIFT-WORLD IDs
Lift-ID: 2661
Place-ID: 4

https://www.seilbahntechnik.net/en/lifts/2661/datas.htm