Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-MGD Schwarzwandbahn










General information  
Place Zauchensee 
resort ?? 
Region Salzburg 
Country   
Name of lift Schwarzwandbahn 
Type 4-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1987 
Commissioning date 1987 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1370,7 m
Height of mountain station 2112,35 m
Vertical rise 741,6 m
Route distance 2142,7 m
Horizontal length 1989,7 m
Average incline 32,27 %
Largest incline 98,03 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) 180 °
Drive altitude of site ?? m
Maximum capacity 1700 Pers/h
Travel time 7,2 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system Siemens 
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) 620 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DS 104 
Cab manufacturer Swoboda 
Cab model Austro Panorama 4 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 120 Stk
Cab distance 42,35 m
Cab interval 8,5 s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 38 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/03/24
PHOTOS: ??

Lift-Statistics
30082 visit(s) since 16/06/03
Last visit 07/12/24

LIFT-WORLD IDs
Lift-ID: 2662
Place-ID: 4

https://www.seilbahntechnik.net/en/lifts/2662/datas.htm