Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Unterbergriedl II










General information  
Place Zauchensee 
resort ?? 
Region Salzburg 
Country   
Name of lift Unterbergriedl II 
Type 2-CLF 
Lift manufacturer Doppelmayr 
Year of construction 1998 
Commissioning date 12 / 1998 
Second-hand lift. Formerly lift no. 6431 


Infos for handicapped persons
Sorry, no information available.

Characteristics
second-hand Lift, former Doppelsesselbahn Zauchensee

geometric data  
Height of valley station 1573,5 m
Height of mountain station 1861,5 m
Vertical rise 288 m
Route distance 1292,74 m
Horizontal length 1253 m
Average incline 22,90 %
Largest incline 65,00 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 3,6 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1435 Pers/h
Travel time 8,29 min
Driving speed line 2,6 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 355 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type 2FG 
Cab manufacturer Doppelmayr 
Cab model 2E Fix 
Seating polystyrene 
Seat heater no 
Persons per cab
Number of cabs 200 Stk
Cab distance 13,50 m
Cab interval 5,02 s


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type electrical 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 10/03/24
PHOTOS: ??

Lift-Statistics
19640 visit(s) since 16/06/03
Last visit 07/12/24

LIFT-WORLD IDs
Lift-ID: 2666
Place-ID: 4

https://www.seilbahntechnik.net/en/lifts/2666/datas.htm