Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Tressdorfer Almbahn



General information  
Place Hermagor 
resort ?? 
Region Carinthia 
Country   
Name of lift Tressdorfer Almbahn 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2026 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
only every second chair with bubble

geometric data  
Height of valley station ?? m
Height of mountain station ?? m
Vertical rise ?? m
Route distance ?? m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2500 Pers/h
Travel time ?? min
Driving speed line ?? m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model DCD 6 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab 6 
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 28.10.2026
PHOTOS: ??

Lift-Statistics
31 visit(s) since 18.09.2026
Last visit 29.10.2026

LIFT-WORLD IDs
Lift-ID: 26949
Place-ID: 193

https://www.seilbahntechnik.net/en/lifts/26949/datas.htm