Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-MGD Rinderhütte 2


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Leukerbad
resort
Region Valais
Country CH Switzerland, Confoederatio Helvetica
Name of lift Rinderhütte 2 
Type 6-MGD 
Lift manufacturer von Roll 
Year of construction 1995 
Commissioning date ??

geometric data  
Height of valley station 1940 m
Height of mountain station 2320 m
Vertical rise 380 m
Route distance 1310 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 Pers/h
Travel time 4,5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 39 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type rope tension weight
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 380 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model X6
Seating carpet
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 51 Stk
Cab distance 67,5 m
Cab interval 13,5 s
Garage type ??
Garage place ??
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 16/08/10 18:06:00
PHOTOS: 20/08/13 20:57:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
8098 visit(s) since 11/03/05
Last visit 15/09/19

LIFT-WORLD IDs
Lift-ID: 2700
Place-ID: 130

https://www.seilbahntechnik.net/en/lifts/2700/datas.htm