Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  60-AT Nebelhorn II










General information  
Place Oberstdorf 
resort Nebelhorn 
Region Bavaria 
Country   
Name of lift Nebelhorn II 
Type 60-AT 
Lift manufacturer Hölzl 
Year of construction 1977 
Commissioning date 08/05/77 
Date of closing down 08/10/20 
Date of pull down 11 / 2020 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1280 m
Height of mountain station 1932 m
Vertical rise 652 m
Route distance 2617,11 m
Horizontal length 2530,56 m
Average incline 26 %
Largest incline ?? %
Number of pillars 3 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 7,0 m
Trackwidth line 10 m
Trackwidth return 6,8 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 620 Pers/h
Travel time ?? min
Driving speed line 12 m/s
Speed on towers 8 m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 360 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Zarges 
Cab model ?? 
Heater ?? 
Aircon ?? 
Persons per cab 60 
Number of cabs 2 Stk
Carriage Operator ?? 


rope data  
Rope manufacturer ?? 
Length of carrying rope ?? m
Length of traction rope ?? m
Length of counter-rope ?? m
Total weight of carrying rope ?? t
Total weight of traction rope ?? t
Total weight of counter-rope ?? t
Carrying rope diameter 55 mm
Traction rope diameter 28 mm
Counter-rope diameter 24 mm
Nominal strength of carrying rope ?? N/mm²
Nominal strength of traction rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of carrying rope ?? kN
Breaking strength of traction rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation carryingrope Valley station 
Tensionstation tractionrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? DEM
Currency (Construction costs) Deutsche Mark 
Construction period ?? months
Seasontime ❄ ☀ all-season 
xxxx hier text hin xxxx yes 
Moving platform no 
Evacuation ropeway yes 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 12/09/22
PHOTOS: ??

Lift-Statistics
14200 visit(s) since 15/09/03
Last visit 04/12/24

LIFT-WORLD IDs
Lift-ID: 2734
Place-ID: 152

https://www.seilbahntechnik.net/en/lifts/2734/datas.htm