Lift-Database » Lifts in the world
2-CLF Graukogelbahn II
General information | |
---|---|
Place | Bad Gastein |
resort | ?? |
Region | Salzburg |
Country | |
Name of lift | Graukogelbahn II |
Type | 2-CLF |
Lift manufacturer | Doppelmayr |
Year of construction | 1980 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1481 m |
Height of mountain station | 1956 m |
Vertical rise | 475 m |
Route distance | 1370 m |
Horizontal length | ?? m |
Average incline | 37,00 % |
Largest incline | 65,00 % |
Number of pillars | ?? Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1316 Pers/h |
Travel time | 9,2 min |
Driving speed line | 2,5 m/s |
electrical data | |
---|---|
Electrical control | Siemens |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | electrical |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | 2FG |
Cab manufacturer | Doppelmayr |
Cab model | 2E Fix |
Seating | Icolan |
Seat heater | no |
Persons per cab | 2 |
Number of cabs | ?? Stk |
Cab distance | ?? m |
Cab interval | ?? s |
rope data | |
---|---|
Rope manufacturer | Teufelberger |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | ?? |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | right |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | ?? months |
Seasontime | ❄ ☀ all-season |
Loading carpet | yes |
Evacuation ropeway | no |
Integrated rescue system | no |
Asset number (Trail map) | ?? |
Updates
Datas: 29/12/23
PHOTOS: ??
Lift-Statistics
20570 visit(s) since 11/01/04
Last visit 14/11/24
LIFT-WORLD IDs
Lift-ID: 2739
Place-ID: 246
https://www.seilbahntechnik.net/en/lifts/2739/datas.htm
Datas: 29/12/23
PHOTOS: ??
Lift-Statistics
20570 visit(s) since 11/01/04
Last visit 14/11/24
LIFT-WORLD IDs
Lift-ID: 2739
Place-ID: 246
https://www.seilbahntechnik.net/en/lifts/2739/datas.htm