Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


3-CLD Wettersteinbahn












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Ehrwald
resort Wetterstein
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Wettersteinbahn 
Type 3-CLD 
Lift manufacturer Doppelmayr 
Year of construction 1999 
Commissioning date ??
Second-hand lift. Formerly lift no. 12052 

geometric data  
Height of valley station 1069 m
Height of mountain station 1490 m
Vertical rise 421 m
Route distance 1522 m
Horizontal length ?? m
Average incline 28,90 %
Largest incline 53,60 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1305 Pers/h
Travel time 6,8 min
Driving speed line 3,7 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Austria Draht 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type ??
Tension way ?? m

electrical data  
Electrical control STG 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DS 103
Cab manufacturer Doppelmayr
Cab model ??
Seating ??
Seat heater no
Persons per cab
Number of cabs 105 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction backward
Loading direction forward

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime ??
Situation of entrance parallel
Situation of exit 90°
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 31/10/20 18:19:43
PHOTOS: 06/11/06 21:12:00

Lift-Statistics
18188 visit(s) since 15/08/03
Last visit 07/12/21

LIFT-WORLD IDs
Lift-ID: 2792
Place-ID: 85

https://www.seilbahntechnik.net/en/lifts/2792/datas.htm