Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-MGD Olympe 2


Mountain station
Mountain station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Meribel
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Olympe 2 
Type 6-MGD 
Lift manufacturer Poma 
Year of construction 1990 
Commissioning date 1990

geometric data  
Height of valley station 1112 m
Height of middle station(s) 1315 m
Height of mountain station 1442 m
Vertical rise 330 m
Route distance 3818 m
Horizontal length 3804 m
Average incline 9 %
Largest incline 35 %
Number of pillars 37 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1400 Pers/h
Travel time 12,73 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Tréfileurope 
Length of haul rope 7850 m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Semer 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 450 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Sigma
Cab model ??
Seating ??
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 79 Stk
Cab distance 36 m
Cab interval 7,2 s
Garage type ground floor
Garage place Middle station(s)
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 31/12/16 16:30:59
PHOTOS: 29/12/05 17:19:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
7673 visit(s) since 19/03/05
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 2800
Place-ID: 1130

https://www.seilbahntechnik.net/en/lifts/2800/datas.htm