Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


12-MGD Mont Vallon


Line
Line

Valley station
Valley station

Mountain station
Mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Méribel-Mottaret
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Mont Vallon 
Type 12-MGD 
Lift manufacturer Poma 
Year of construction 1988 
Commissioning date 1988

geometric data  
Height of valley station 2125 m
Height of mountain station 2919 m
Vertical rise 794 m
Route distance 2210 m
Horizontal length ?? m
Average incline ?? %
Largest incline 54 %
Number of pillars 32 Stk
Greatest spanwidth 300 m
Max ground clearance 43 m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3600 Pers/h
Travel time 6,15 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 39 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 1300 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type Omega TL
Cab manufacturer Sigma
Cab model ??
Seating none
Seat heater no
Heater no
Aircon no
Persons per cab 12 
Number of cabs 71 Stk
Cab distance 76,2 m
Cab interval 12,7 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 30 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 05/01/17 14:32:00
PHOTOS: 21/05/04 11:18:14

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
9376 visit(s) since 22/09/03
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 2801
Place-ID: 1131

https://www.seilbahntechnik.net/en/lifts/2801/datas.htm