Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Mont Vallon

Line
Line

Valley station
Valley station

Mountain station
Mountain station

General information  
Place Méribel-Mottaret 
resort Les Trois Vallées 
Region Rhône-Alpes 
Country   
Name of lift Mont Vallon 
Type 10-MGD 
Lift manufacturer Poma 
Year of construction 1988 
Commissioning date 1988 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2125 m
Height of mountain station 2919 m
Vertical rise 794 m
Route distance 2210 m
Horizontal length ?? m
Average incline ?? %
Largest incline 54 %
Number of pillars 32 Stk
Greatest spanwidth 300 m
Max ground clearance 43 m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3600 Pers/h
Travel time 6,15 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 1300 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type Omega TL 
Cab manufacturer Sigma 
Cab model ?? 
Seating none 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 71 Stk
Cab distance 76,2 m
Cab interval 12,7 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 39 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 30 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 30/01/22
PHOTOS: ??

Lift-Statistics
14955 visit(s) since 22/09/03
Last visit 04/12/24

LIFT-WORLD IDs
Lift-ID: 2801
Place-ID: 1131

https://www.seilbahntechnik.net/en/lifts/2801/datas.htm