Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Buchensteinwandbahn

Line
Line

Line
Line

Line
Line

General information  
Place St. Ulrich am Pillersee 
resort Buchensteinwand 
Region Tyrol 
Country   
Name of lift Buchensteinwandbahn 
Type 4-CLD/B 
Lift manufacturer SSG 
Year of construction 1990 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
SSG went bankrupt during the construction period. Therefore, the supports 20 a and b and the complete drive of Doppelmayr. Emergency drive from Scania. In 2009, orange bubbles were applied.

geometric data  
Height of valley station 855 m
Height of mountain station 1440 m
Vertical rise 585 m
Route distance 1974 m
Horizontal length ?? m
Average incline 31,10 %
Largest incline 60,00 %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1784 Pers/h
Travel time 6,7 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer SSG 
Cab model ?? 
Bubble colour ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 107 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 24/12/23
PHOTOS: ??

Lift-Statistics
13151 visit(s) since 09/08/03
Last visit 21/12/24

LIFT-WORLD IDs
Lift-ID: 2836
Place-ID: 555

https://www.seilbahntechnik.net/en/lifts/2836/datas.htm