Lift-Database » Lifts in the world
2-CLF DSB Schwarzsee
General information | |
---|---|
Place | Afritz am See |
resort | ?? |
Region | Carinthia |
Country | |
Name of lift | DSB Schwarzsee |
Type | 2-CLF |
Lift manufacturer | De Pretis |
Year of construction | 1978 |
Commissioning date | 21/01/78 |
Date of closing down | 05 / 2012 |
Date of pull down | 07 / 2016 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1267 m |
Height of middle station(s) | 1510 m |
Height of mountain station | 1830 m |
Vertical rise | 563 m |
Route distance | 2015 m |
Horizontal length | 1922 m |
Average incline | 29,15 % |
Largest incline | 61,27 % |
Number of pillars | 19 Stk |
Greatest spanwidth | 210 m |
Max ground clearance | 18 m |
Trackwidth drive | 3,60 m |
Trackwidth line | 3,60 m |
Trackwidth return | 3,60 m |
Angle of wrap (drive wheel) | 180 ° |
Drive altitude of site | ?? m |
Maximum capacity | 790 Pers/h |
Travel time | 13,43 min |
Driving speed line | 2,5 m/s |
electrical data | |
---|---|
Electrical control | AEG |
Remote control and telemonitoring system | AEG |
Power control system | AEG |
Number of drive | 1 Stk |
Drive power (Start) | 252 kW |
Drive power (Operation) | 216 kW |
Brake power | 97 kW |
Continuous brake power | 77 kW |
Driving station | Valley station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | gas engine |
Traction of emergency drive | mechanical |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Girak |
Cab model | ?? |
Seating | ?? |
Seat heater | no |
Persons per cab | 2 |
Number of cabs | 178 Stk |
Cab distance | 22,78 m |
Cab interval | 9,11 s |
rope data | |
---|---|
Rope manufacturer | Teufelberger |
Length of haul rope | 4200 m |
Total weight of haul rope | 20,3 t |
Haul rope diameter | 36 mm |
Nominal strength of haul rope | 1960 N/mm² |
Breaking strength of rope | 1015 kN |
Tensionstation haulrope | Valley station |
Tension type | rope tension weight |
Tension way | 6 m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | left |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | 12 months |
Seasontime | ❄ ☀ all-season |
Loading carpet | no |
Evacuation ropeway | no |
Integrated rescue system | no |
Asset number (Trail map) | ?? |
Updates
Datas: 09/09/22
PHOTOS: ??
Lift-Statistics
14925 visit(s) since 27/09/03
Last visit 15/11/24
LIFT-WORLD IDs
Lift-ID: 285
Place-ID: 30
https://www.seilbahntechnik.net/en/lifts/285/datas.htm
Datas: 09/09/22
PHOTOS: ??
Lift-Statistics
14925 visit(s) since 27/09/03
Last visit 15/11/24
LIFT-WORLD IDs
Lift-ID: 285
Place-ID: 30
https://www.seilbahntechnik.net/en/lifts/285/datas.htm