Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-MGD Rosskopf / Monte Cavallo


Line
Line

Valley station
Valley station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Sterzing / Vipiteno
resort
Dolomiti Superski


Region Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Rosskopf / Monte Cavallo 
Type 6-MGD 
Lift manufacturer Leitner 
Year of construction 1987 
Commissioning date ??

geometric data  
Height of valley station 961 m
Height of middle station(s) ?? m
Height of mountain station 1853,5 m
Vertical rise 892,5 m
Route distance 2719 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 26 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1667 Pers/h
Travel time 9,5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 840 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Seating ??
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 84 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ??
Garage place ??
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map)




This information are for members only visible!



Updates
Datas: 19/02/19 20:35:57
PHOTOS: 08/11/06 21:40:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
8783 visit(s) since 05/12/03
Last visit 23/10/19

LIFT-WORLD IDs
Lift-ID: 2894
Place-ID: 1609

https://www.seilbahntechnik.net/en/lifts/2894/datas.htm