Lift-Database » Lifts in the world
4-CLD Gaisberg

Mountain station

Pillar

Valley station
General information | |
---|---|
Place | Kirchberg |
resort | ?? |
Region | Tyrol |
Country | ![]() |
Name of lift | Gaisberg |
Type | 4-CLD |
Lift manufacturer | Doppelmayr |
Year of construction | 2003 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 800 m |
Height of mountain station | 1235 m |
Vertical rise | 435 m |
Route distance | 1525 m |
Horizontal length | ?? m |
Average incline | ?? % |
Largest incline | ?? % |
Number of pillars | 13 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1600 Pers/h |
Travel time | 5 min |
Driving speed line | 5,0 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | Siemens |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Doppelmayr |
Cab model | ?? |
Seating | leather |
Seat heater | no |
Persons per cab | 4 |
Number of cabs | 74 Stk |
Cab distance | ?? m |
Cab interval | ?? s |
Garage type | station circulation |
Garage place | valley and mountain |
Garage direction | forward |
Loading direction | backward |
rope data | |
---|---|
Rope manufacturer | Teufelberger |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | ?? |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | left |
Construction costs | ?? EUR |
Currency (Construction costs) | Euro |
Construction period | ?? months |
Seasontime | ❄ ☀ all-season |
Situation of entrance | parallel |
Situation of exit | parallel |
Loading carpet | no |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Rope position control | ?? |
Asset number (Trail map) | E1 |
Updates
Datas: 03/02/25
PHOTOS: ??
Lift-Statistics
22315 visit(s) since 06/05/04
Last visit 09/02/25
LIFT-WORLD IDs
Lift-ID: 2968
Place-ID: 55
https://www.seilbahntechnik.net/en/lifts/2968/datas.htm
Datas: 03/02/25
PHOTOS: ??
Lift-Statistics
22315 visit(s) since 06/05/04
Last visit 09/02/25
LIFT-WORLD IDs
Lift-ID: 2968
Place-ID: 55
https://www.seilbahntechnik.net/en/lifts/2968/datas.htm