Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-MGD Alpenrosenbahn I












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Westendorf
resort SkiWelt
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Alpenrosenbahn I 
Type 6-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1987 
Commissioning date ??

geometric data  
Height of valley station 796 m
Height of mountain station 1318 m
Vertical rise 522 m
Route distance 1485 m
Horizontal length ?? m
Average incline 38,00 %
Largest incline 89,90 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2120 Pers/h
Travel time 5,0 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type rope tension weight
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type diesel engine
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DS 106
Cab manufacturer CWA
Cab model OMEGA 6s
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 123 Stk
Cab distance 51 m
Cab interval ?? s
Garage type ground floor
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) 110 




This information are for members only visible!



Updates
Datas: 06/05/15 20:32:32
PHOTOS: 20/04/08 19:14:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
16433 visit(s) since 19/09/03
Last visit 22/08/19

LIFT-WORLD IDs
Lift-ID: 3024
Place-ID: 72

https://www.seilbahntechnik.net/en/lifts/3024/datas.htm