Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-MGD Areitbahn I










General information  
Place Schuettdorf 
resort Ski Alpin Card 
Region Salzburg 
Country   
Name of lift Areitbahn I 
Type 6-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1988 
Commissioning date 15/12/88 
Date of closing down 17/04/17 
Date of pull down 18/04/17 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Has transported about 25 million guests from 1988 to 2017.

geometric data  
Height of valley station 757 m
Height of mountain station 1400 m
Vertical rise 643 m
Route distance 1924 m
Horizontal length ?? m
Average incline 36,30 %
Largest incline 78,20 %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 6,3 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DS 106 
Cab manufacturer CWA 
Cab model OMEGA 6s 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 110 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley and mountain 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway yes 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 15/02/24
PHOTOS: ??

Lift-Statistics
22075 visit(s) since 11/08/03
Last visit 21/12/24

LIFT-WORLD IDs
Lift-ID: 3037
Place-ID: 254

https://www.seilbahntechnik.net/en/lifts/3037/datas.htm