Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-MGD Areit I












Infos for handicapped persons
Sorry, no information available.

Characteristics
Has transported about 25 million guests from 1988 to 2017.

General information  
Place Schuettdorf
resort Schmittenhoehe
Region Salzburg
Country AT Austria, Österreich
Name of lift Areit I 
Type 6-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1988 
Commissioning date 15/12/88
Date of closing down 17/04/17
Date of pull down 18/04/17

geometric data  
Height of valley station 757 m
Height of mountain station 1400 m
Vertical rise 643 m
Route distance 1924 m
Horizontal length ?? m
Average incline 36,30 %
Largest incline 78,20 %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 6,3 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DS 106
Cab manufacturer CWA
Cab model OMEGA 6s
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 110 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway yes
Integrated rescue system ??
Rope position control ??
Asset number (Trail map)




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/12/19 22:21:54
PHOTOS: 05/09/06 21:51:00

Lift-Statistics
17530 visit(s) since 11/08/03
Last visit 21/10/21

LIFT-WORLD IDs
Lift-ID: 3037
Place-ID: 254

https://www.seilbahntechnik.net/en/lifts/3037/datas.htm