Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-MGD Areitbahn III




General information  
Place Schuettdorf 
resort Ski Alpin Card 
Region Salzburg 
Country   
Name of lift Areitbahn III 
Type 6-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1996 
Commissioning date 1996 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1713 m
Height of mountain station 1901 m
Vertical rise 188 m
Route distance 1472 m
Horizontal length ?? m
Average incline 13,4 %
Largest incline 48,5 %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 4 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 135 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground 
Garage place valley and middle station(s) 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 08/08/22
PHOTOS: ??

Lift-Statistics
16926 visit(s) since 27/09/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 3039
Place-ID: 254

https://www.seilbahntechnik.net/en/lifts/3039/datas.htm