Lift-Database » Lifts in the world
2-CLF Sonnenbahn
Line
General information | |
---|---|
Place | Turracher Hoehe |
resort | ?? |
Region | Styria |
Country | |
Name of lift | Sonnenbahn |
Type | 2-CLF |
Lift manufacturer | Girak |
Year of construction | 1995 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1763 m |
Height of middle station(s) | ?? m |
Height of mountain station | 1935 m |
Vertical rise | 172 m |
Route distance | 586 m |
Horizontal length | ?? m |
Average incline | 32,10 % |
Largest incline | 91,10 % |
Number of pillars | 7 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1008 Pers/h |
Travel time | 4,0 min |
Driving speed line | 2,4 m/s |
electrical data | |
---|---|
Electrical control | Siemens |
Remote control and telemonitoring system | ?? |
Power control system | Siemens |
Number of drive | 1 Stk |
Drive power (Start) | 86 kW |
Drive power (Operation) | 65 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | diesel engine |
Traction of emergency drive | hydrostatic |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Girak |
Cab model | ?? |
Seating | polystyrene |
Seat heater | no |
Persons per cab | 2 |
Number of cabs | 70 Stk |
Cab distance | ?? m |
Cab interval | ?? s |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Mountain station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | right |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | ?? months |
Seasontime | ❄ winter |
Loading carpet | no |
Evacuation ropeway | no |
Integrated rescue system | no |
Asset number (Trail map) | ?? |
Updates
Datas: 17/09/23
PHOTOS: ??
Lift-Statistics
12712 visit(s) since 19/01/05
Last visit 15/11/24
LIFT-WORLD IDs
Lift-ID: 3042
Place-ID: 172
https://www.seilbahntechnik.net/en/lifts/3042/datas.htm
Datas: 17/09/23
PHOTOS: ??
Lift-Statistics
12712 visit(s) since 19/01/05
Last visit 15/11/24
LIFT-WORLD IDs
Lift-ID: 3042
Place-ID: 172
https://www.seilbahntechnik.net/en/lifts/3042/datas.htm