Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Hornspitz Express I

Mountain Station
Mountain Station

Mountain Station
Mountain Station

Line
Line

General information  
Place Gosau 
resort ?? 
Region Upper Austria 
Country   
Name of lift Hornspitz Express I 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1991 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 748,00 m
Height of middle station(s) ?? m
Height of mountain station 1139,50 m
Vertical rise 391,50 m
Route distance 1604,50 m
Horizontal length ?? m
Average incline 26,16 %
Largest incline 57,57 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1795 Pers/h
Travel time 5,45 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 391 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DS 104 
Cab manufacturer Doppelmayr 
Cab model 4E95/B 
Bubble colour neutral 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 90 Stk
Cab distance 40,11 m
Cab interval 8,02 s
Garage type ground floor 
Garage place mountain station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 36 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) G1 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/11/23
PHOTOS: ??

Lift-Statistics
11844 visit(s) since 10/02/04
Last visit 22/12/24

LIFT-WORLD IDs
Lift-ID: 3047
Place-ID: 347

https://www.seilbahntechnik.net/en/lifts/3047/datas.htm