Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD Obermuribahn


Valley Station
Valley Station

Mountain Station
Mountain Station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Kloesterle
resort Sonnenkopf
Ski Arlberg
Region Vorarlberg
Country AT Austria, Österreich
Name of lift Obermuribahn 
Type 4-CLD 
Lift manufacturer Doppelmayr 
Year of construction 1997 
Commissioning date ??

geometric data  
Height of valley station 1832 m
Height of mountain station 2179 m
Vertical rise 347 m
Route distance 1465 m
Horizontal length ?? m
Average incline 24,60 %
Largest incline 45,60 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 5,0 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 104
Cab manufacturer Doppelmayr
Cab model 4E95
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 106 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Situation of entrance 90°
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map)




This information are for members only visible!



Updates
Datas: 17/09/16 21:35:20
PHOTOS: 28/03/04 12:02:11

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
8853 visit(s) since 26/09/03
Last visit 19/10/19

LIFT-WORLD IDs
Lift-ID: 3054
Place-ID: 118

https://www.seilbahntechnik.net/en/lifts/3054/datas.htm