Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Hochmaisbahn

Valley station
Valley station

Mountain station
Mountain station




General information  
Place Maria Alm 
resort ?? 
Region Salzburg 
Country   
Name of lift Hochmaisbahn 
Type 2-CLF 
Lift manufacturer Doppelmayr 
Year of construction 1995 
Commissioning date 1995 
Date of closing down 2010 
Date of pull down 2010 
Second-hand lift. Formerly lift no. 16313 


Infos for handicapped persons
Sorry, no information available.

Characteristics
second-Hand Lift

geometric data  
Height of valley station 989 m
Height of mountain station 1373 m
Vertical rise 384 m
Route distance 1154 m
Horizontal length ?? m
Average incline 35,60 %
Largest incline 62,00 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1100 Pers/h
Travel time 8,4 min
Driving speed line 2,3 m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 250 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 150 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 34 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ??  
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/11/23
PHOTOS: ??

Lift-Statistics
12956 visit(s) since 10/10/04
Last visit 14/11/24

LIFT-WORLD IDs
Lift-ID: 3060
Place-ID: 234

https://www.seilbahntechnik.net/en/lifts/3060/datas.htm