Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-MGD Hochalmbahn 1


Mountain Station
Mountain Station








Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Rauris
resort Hochalmbahnen
Region Salzburg
Country AT Austria, Österreich
Name of lift Hochalmbahn 1 
Type 6-MGD 
Lift manufacturer Felix Wopfner 
Year of construction 1993 
Commissioning date 1993

geometric data  
Height of valley station 947,25 m
Height of mountain station 1475,9 m
Vertical rise 528,65 m
Route distance 1260,99 m
Horizontal length 1144,82 m
Average incline 46,18 %
Largest incline 87,17 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1351 (1590) Pers/h
Travel time 4,4 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Swoboda
Cab model ULTRA 6
Seating ??
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 38 (45) Stk
Cab distance ?? m
Cab interval ?? s
Garage type ??
Garage place ??
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ??
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 23/11/19 22:34:26
PHOTOS: 20/02/18 21:39:42

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
8129 visit(s) since 19/09/03
Last visit 24/02/20

LIFT-WORLD IDs
Lift-ID: 3073
Place-ID: 255

https://www.seilbahntechnik.net/en/lifts/3073/datas.htm