Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLF Limberg


Valley station
Valley station

Line
Line

Mountain station
Mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
should have been replaced in summer 2020, due to the covid-19 outbreak it was rescheduled to 2021

General information  
Place Saalbach
resort
Skicircus
Ski Alpin Card
Region Salzburg
Country AT Austria, Österreich
Name of lift Limberg 
Type 4-CLF 
Lift manufacturer Doppelmayr 
Year of construction 1994 
Commissioning date ??

geometric data  
Height of valley station 1707 m
Height of mountain station 2019 m
Vertical rise 312 m
Route distance 899 m
Horizontal length ?? m
Average incline 37,20 %
Largest incline ?? %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2376 Pers/h
Travel time 6,8 min
Driving speed line 2,2 m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type 4FG
Cab manufacturer Doppelmayr
Cab model ??
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 137 Stk
Cab distance ?? m
Cab interval ?? s

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  ATS 
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter
Loading carpet yes
Evacuation ropeway ??
Integrated rescue system ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 17/04/20 19:54:47
PHOTOS: 03/06/07 12:23:00

Lift-Statistics
10805 visit(s) since 26/12/03
Last visit 21/09/20

LIFT-WORLD IDs
Lift-ID: 3082
Place-ID: 295

https://www.seilbahntechnik.net/en/lifts/3082/datas.htm