Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


2-CLF DSB Unterberg (Flutlicht)


Mountain station
Mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
Only skiing by night.
Every Tue and Thu open.

General information  
Place Flachau
resort Ski amadé
Region Salzburg
Country AT Austria, Österreich
Name of lift DSB Unterberg (Flutlicht) 
Type 2-CLF 
Lift manufacturer Girak-Garaventa 
Year of construction 1976/200 
Commissioning date 1976
Date of closing down 2015
Date of pull down 2015

geometric data  
Height of valley station 885 m
Height of mountain station 1187 m
Vertical rise 302 m
Route distance 1104 m
Horizontal length ?? m
Average incline 28,50 %
Largest incline 50,20 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1100 Pers/h
Travel time 7,8 min
Driving speed line 2,3 m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type rope tension weight
Tension way ?? m

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ??
Power control system ??
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive direct drive
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type 2FG
Cab manufacturer Girak-Garaventa
Cab model 2E Fix
Seating polystyrene
Seat heater no
Persons per cab
Number of cabs 145 Stk
Cab distance ?? m
Cab interval ?? s

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 27/11/15 18:23:47
PHOTOS: 28/12/03 11:52:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
10823 visit(s) since 25/08/03
Last visit 19/08/19

LIFT-WORLD IDs
Lift-ID: 3085
Place-ID: 208

https://www.seilbahntechnik.net/en/lifts/3085/datas.htm