Lift-Database » Lifts in the world
1-CLF Sesselbahn Wilder Kaiser II

Bottom Station Lift 2

Way Lift 2

Top Station Lift 2
General information | |
---|---|
Place | Kufstein |
resort | ?? |
Region | Tyrol |
Country | ![]() |
Name of lift | Sesselbahn Wilder Kaiser II |
Type | 1-CLF |
Lift manufacturer | Swoboda |
Year of construction | 1970/15 |
Commissioning date | 01 / 1971 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 894 m |
Height of mountain station | 1260 m |
Vertical rise | 366 m |
Route distance | 1167 m |
Horizontal length | 1105 m |
Average incline | ?? % |
Largest incline | ?? % |
Number of pillars | 16 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 309 Pers/h |
Travel time | 8,6 min |
Driving speed line | 2,25 m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | 83 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | diesel engine |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Doppelmayr |
Cab model | ?? |
Seating | polystyrene |
Seat heater | no |
Persons per cab | 1 |
Number of cabs | 90 Stk |
Cab distance | 25,9 m |
Cab interval | 11,5 s |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | 2334 m |
Total weight of haul rope | ?? t |
Haul rope diameter | 24 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | rope tension weight |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | left |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | 4 months |
Seasontime | ☀ summer |
Loading carpet | no |
Evacuation ropeway | no |
Integrated rescue system | no |
Asset number (Trail map) | ?? |
Updates
Datas: 3 mei 2025
PHOTOS: ??
Lift-Statistics
19382 visit(s) since 19 mrt 2005
Last visit 5 mei 2025
LIFT-WORLD IDs
Lift-ID: 312
Place-ID: 466
https://www.seilbahntechnik.net/en/lifts/312/datas.htm
Datas: 3 mei 2025
PHOTOS: ??
Lift-Statistics
19382 visit(s) since 19 mrt 2005
Last visit 5 mei 2025
LIFT-WORLD IDs
Lift-ID: 312
Place-ID: 466
https://www.seilbahntechnik.net/en/lifts/312/datas.htm