Lift-Database » Lifts in the world
2-CLF Ochsenbergbahn
General information | |
---|---|
Place | St. Georgen ob Murau |
resort | ?? |
Region | Styria |
Country | |
Name of lift | Ochsenbergbahn |
Type | 2-CLF |
Lift manufacturer | Girak |
Year of construction | 1975 |
Commissioning date | 21/12/75 |
Date of closing down | 28/02/21 |
Date of pull down | 03/03/21 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1435 m |
Height of mountain station | 1770 m |
Vertical rise | 335 m |
Route distance | 1684 m |
Horizontal length | 1664 m |
Average incline | 20,00 % |
Largest incline | 40,80 % |
Number of pillars | 15 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1360 Pers/h |
Travel time | 11,0 min |
Driving speed line | 2,5 m/s |
electrical data | |
---|---|
Electrical control | Elin |
Remote control and telemonitoring system | Elin |
Power control system | Elin |
Number of drive | 2 Stk |
Drive power (Start) | 250 kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | gas engine |
Traction of emergency drive | mechanical |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Girak |
Cab model | ?? |
Seating | Icolan |
Seat heater | no |
Persons per cab | 2 |
Number of cabs | 253 Stk |
Cab distance | 13,5 m |
Cab interval | 5,4 s |
rope data | |
---|---|
Rope manufacturer | Austria Draht |
Length of haul rope | 3400 m |
Total weight of haul rope | ?? t |
Haul rope diameter | 36 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | rope tension weight |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | ?? months |
Seasontime | ❄ winter |
Loading carpet | no |
Evacuation ropeway | no |
Integrated rescue system | no |
Asset number (Trail map) | 4 |
Updates
Datas: 14/11/22
PHOTOS: ??
Lift-Statistics
7584 visit(s) since 20/02/05
Last visit 13/11/24
LIFT-WORLD IDs
Lift-ID: 3123
Place-ID: 2055
https://www.seilbahntechnik.net/en/lifts/3123/datas.htm
Datas: 14/11/22
PHOTOS: ??
Lift-Statistics
7584 visit(s) since 20/02/05
Last visit 13/11/24
LIFT-WORLD IDs
Lift-ID: 3123
Place-ID: 2055
https://www.seilbahntechnik.net/en/lifts/3123/datas.htm