Lift-Database » Lifts in the world
2-CLF Doppelsessellift Aflenz - Bürgeralm

General information | |
---|---|
Place | Aflenz |
resort | Buergeralm |
Region | Styria |
Country | ![]() |
Name of lift | Doppelsessellift Aflenz - Bürgeralm |
Type | 2-CLF |
Lift manufacturer | Girak |
Year of construction | 1976/16 |
Commissioning date | 04/12/76 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 862 m |
Height of mountain station | 1537 m |
Vertical rise | 675 m |
Route distance | 1886 m |
Horizontal length | 1718 m |
Average incline | 39,30 % |
Largest incline | 82,00 % |
Number of pillars | 25 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | 18 m |
Trackwidth drive | 3,6 m |
Trackwidth line | 3,6 m |
Trackwidth return | 3,6 m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | 1539 m |
Maximum capacity | 600 Pers/h |
Travel time | 12,5 min |
Driving speed line | 2,5 m/s |
electrical data | |
---|---|
Electrical control | Siemens |
Remote control and telemonitoring system | Siemens |
Power control system | Siemens |
Number of drive | 1 Stk |
Drive power (Start) | 260 kW |
Drive power (Operation) | 220 kW |
Brake power | -50 kW |
Continuous brake power | -80 kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | gas engine |
Traction of emergency drive | mechanical |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Doppelmayr |
Cab model | ?? |
Seating | Icolan |
Seat heater | no |
Persons per cab | 2 |
Number of cabs | 120 Stk |
Cab distance | 32 m |
Cab interval | 13 s |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | 3792 m |
Total weight of haul rope | ?? t |
Haul rope diameter | 36 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | rope tension weight |
Tension way | 6 m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | right |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | 7 months |
Seasontime | ❄ ☀ all-season |
Loading carpet | no |
Evacuation ropeway | no |
Integrated rescue system | no |
Asset number (Trail map) | A |
Updates
Datas: 31/12/22
PHOTOS: ??
Lift-Statistics
13561 visit(s) since 05/12/03
Last visit 28/09/23
LIFT-WORLD IDs
Lift-ID: 3136
Place-ID: 13
https://www.seilbahntechnik.net/en/lifts/3136/datas.htm
Datas: 31/12/22
PHOTOS: ??
Lift-Statistics
13561 visit(s) since 05/12/03
Last visit 28/09/23
LIFT-WORLD IDs
Lift-ID: 3136
Place-ID: 13
https://www.seilbahntechnik.net/en/lifts/3136/datas.htm