Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Krispenbahn

valley station with track
valley station with track

total
total

mountain station
mountain station

General information  
Place Donnersbachwald 
resort ?? 
Region Styria 
Country   
Name of lift Krispenbahn 
Type 4-CLF 
Lift manufacturer Girak-Garaventa 
Year of construction 1999 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
former name "Little John"

geometric data  
Height of valley station 1556 m
Height of middle station(s) ?? m
Height of mountain station 1822 m
Vertical rise 266 m
Route distance 671 m
Horizontal length ?? m
Average incline 43,00 %
Largest incline 84,00 %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 6,5 min
Driving speed line 2,0 m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Girak-Garaventa 
Cab model ?? 
Seating polystyrene 
Seat heater no 
Persons per cab
Number of cabs 65 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 10/03/24
PHOTOS: ??

Lift-Statistics
6767 visit(s) since 24/12/03
Last visit 13/03/25

LIFT-WORLD IDs
Lift-ID: 3147
Place-ID: 390

https://www.seilbahntechnik.net/en/lifts/3147/datas.htm