Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Rittisbergbahn

Valley station
Valley station

Mountain station
Mountain station

Mountain station
Mountain station

General information  
Place Ramsau am Dachstein 
resort Ski amadé 
Region Styria 
Country   
Name of lift Rittisbergbahn 
Type 4-CLF 
Lift manufacturer Doppelmayr 
Year of construction 1998 
Commissioning date 1998 
Date of closing down 27/03/22 
Date of pull down 05/04/22 


Infos for handicapped persons
Sorry, no information available.

Characteristics
sold to Poland

geometric data  
Height of valley station 1150 m
Height of mountain station 1500 m
Vertical rise 316 m
Route distance 877 m
Horizontal length 814 m
Average incline 38,82 %
Largest incline 62,24 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 4,80 m
Trackwidth line 4,80 m
Trackwidth return 4,80 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site 1183 m
Maximum capacity 1515 Pers/h
Travel time 5,6 min
Driving speed line 2,6 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 220 kW
Drive power (Operation) 180 kW
Brake power -160 kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type 4FG 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 72 Stk
Cab distance 24,71 m
Cab interval 9,5 s


rope data  
Rope manufacturer ?? 
Length of haul rope 1779 m
Total weight of haul rope ?? t
Haul rope diameter 36 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 02/02/24
PHOTOS: ??

Lift-Statistics
8320 visit(s) since 03/01/04
Last visit 29/12/24

LIFT-WORLD IDs
Lift-ID: 3159
Place-ID: 518

https://www.seilbahntechnik.net/en/lifts/3159/datas.htm