Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD/B Einzeiger


Valley station
Valley station

Mountain station
Mountain station

Valley station
Valley station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Soelden
resort White 5
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Einzeiger 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1998 
Commissioning date 1998

geometric data  
Height of valley station 2505 m
Height of mountain station 2766 m
Vertical rise 262 m
Route distance 1121 m
Horizontal length ?? m
Average incline 24,80 %
Largest incline 69,70 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 4,8 m
Trackwidth line 4,8 m
Trackwidth return 4,8 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 3,7 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way 8 m

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ??
Power control system Elin 
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type DT 104
Cab manufacturer Doppelmayr
Cab model 4E98/B
Bubble colour neutral
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 79 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground
Garage place valley station
Garage direction forward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) D 51 




This information are for members only visible!



Updates
Datas: 03/05/15 19:03:09
PHOTOS: 20/02/04 11:28:34

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
12127 visit(s) since 26/12/02
Last visit 15/09/19

LIFT-WORLD IDs
Lift-ID: 32
Place-ID: 1

https://www.seilbahntechnik.net/en/lifts/32/datas.htm