Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-MGD Ariondaz


Valley station
Valley station

Line
Line

Mountain station
Mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Courchevel
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Ariondaz 
Type 6-MGD 
Lift manufacturer Poma 
Year of construction 1974 
Commissioning date 1974

geometric data  
Height of valley station 1599 m
Height of mountain station 2015 m
Vertical rise 451 m
Route distance 2440 m
Horizontal length ?? m
Average incline 19 %
Largest incline 28 %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 10,17 min
Driving speed line 4,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 36 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type rope tension weight
Tension way ?? m

electrical data  
Electrical control Semer 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 390 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model OMEGA 6 fl
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 100 Stk
Cab distance 57,6 m
Cab interval 14,4 s
Garage type ground floor
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 14/01/17 16:56:05
PHOTOS: 27/08/05 21:55:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
8038 visit(s) since 19/09/03
Last visit 21/09/19

LIFT-WORLD IDs
Lift-ID: 3286
Place-ID: 1009

https://www.seilbahntechnik.net/en/lifts/3286/datas.htm