Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-MGD Forêt


Valley station
Valley station

Line
Line

Technical
Technical


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Courchevel
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Forêt 
Type 4-MGD 
Lift manufacturer Poma 
Year of construction 1971 
Commissioning date 1971
Date of closing down 2014
Date of pull down 2014

geometric data  
Height of valley station 1282 m
Height of mountain station 2093 m
Vertical rise 811 m
Route distance 1984 m
Horizontal length ?? m
Average incline 41 %
Largest incline 69 %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time 8,27 min
Driving speed line 4,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 33 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type rope tension weight
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 236 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer ??
Cab model ??
Seating ??
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 80 Stk
Cab distance 57,6 m
Cab interval 14,4 s
Garage type ground floor
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 17/01/17 22:06:36
PHOTOS: 29/08/05 21:33:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
8121 visit(s) since 19/09/03
Last visit 17/09/19

LIFT-WORLD IDs
Lift-ID: 3288
Place-ID: 1009

https://www.seilbahntechnik.net/en/lifts/3288/datas.htm