Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


2-CLF Brändbahn


valley station
valley station

track
track

top station
top station


Infos for handicapped persons
Sorry, no information available.

Characteristics
2010 decommissioned, as the operating company went bankrupt, dismantled in 2012, because the operating license for the lift hasn\'t been extended.
The system consisted of many old parts of various manufacturers.
Scrapped after dismantling!

General information  
Place Pettneu am Arlberg
resort Ski Arlberg
Lavenar
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Brändbahn 
Type 2-CLF 
Lift manufacturer Felix Wopfner 
Year of construction 1997 
Commissioning date 1997
Date of closing down 2010
Date of pull down 2012

geometric data  
Height of valley station 1401 m
Height of middle station(s) ?? m
Height of mountain station 1883 m
Vertical rise 482 m
Route distance 1543 m
Horizontal length ?? m
Average incline ?? %
Largest incline 75,70 %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 450 Pers/h
Travel time 11,4 min
Driving speed line 2,3 m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer ??
Cab model ??
Seating duckboard (plastic)
Seat heater no
Persons per cab
Number of cabs 85 Stk
Cab distance ?? m
Cab interval ?? s

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Loading carpet no
Evacuation ropeway no
Integrated rescue system ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 12/09/17 21:18:34
PHOTOS: 09/04/16 15:41:33

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
8164 visit(s) since 24/09/03
Last visit 22/10/19

LIFT-WORLD IDs
Lift-ID: 340
Place-ID: 189

https://www.seilbahntechnik.net/en/lifts/340/datas.htm