Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Zwerenalpe












Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Riezlern
resort Fellhorn / Kanzelwand
Region Vorarlberg
Country AT Austria, Österreich
Name of lift Zwerenalpe 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2003 
Commissioning date ??

geometric data  
Height of valley station 1727 m
Height of mountain station 1949 m
Vertical rise 222 m
Route distance 558 m
Horizontal length 511 m
Average incline ?? %
Largest incline ?? %
Number of pillars 5 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2366 Pers/h
Travel time ?? min
Driving speed line 4 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope 1290 m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 307 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ??
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 106
Cab manufacturer Doppelmayr
Cab model 6E98/B
Bubble colour neutral
Seating ??
Seat heater no
Persons per cab
Number of cabs 36 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction forward
Loading direction backward

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ??
Construction costs 3,500,000  EUR 
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter
Situation of entrance 90°
Situation of exit ??
Loading carpet ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/02/21 07:57:06
PHOTOS: 30/06/07 21:36:00

Lift-Statistics
11499 visit(s) since 28/12/03
Last visit 27/10/21

LIFT-WORLD IDs
Lift-ID: 3459
Place-ID: 176

https://www.seilbahntechnik.net/en/lifts/3459/datas.htm