Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


1-CLF Hochsölden












Infos for handicapped persons
Sorry, no information available.

Characteristics
Middle station out of order and now removed.
Since 2011 only 50% up- and downhill transportation.

General information  
Place Soelden
resort White 5
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Hochsölden 
Type 1-CLF 
Lift manufacturer Felix Wopfner 
Year of construction 1948 
Commissioning date 1948
Date of closing down 15/04/12
Date of pull down 2012

geometric data  
Height of valley station 1354 m
Height of middle station(s) ?? m
Height of mountain station 2092 m
Vertical rise 738 m
Route distance 2203 m
Horizontal length ?? m
Average incline 35,80 %
Largest incline 58,00 %
Number of pillars 26 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 398 Pers/h
Travel time 16,25 min
Driving speed line 2,25 m/s

rope data  
Rope manufacturer ??
Length of haul rope 4431 m
Total weight of haul rope ?? t
Haul rope diameter 26 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type rope tension weight
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 120 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Felix Wopfner
Cab model ??
Seating polystyrene
Seat heater no
Persons per cab
Number of cabs 235 Stk
Cab distance 18,6 m
Cab interval ?? s

miscellaneous data  
Transport uphill 50 %
Transport downhill 50 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Loading carpet no
Evacuation ropeway no
Integrated rescue system ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 16/03/16 22:05:29
PHOTOS: 29/01/06 21:05:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
18527 visit(s) since 24/11/02
Last visit 13/10/19

LIFT-WORLD IDs
Lift-ID: 352
Place-ID: 1

https://www.seilbahntechnik.net/en/lifts/352/datas.htm