Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  1-CLF Hochsölden

Valley Station
Valley Station

Valley Station
Valley Station

Line
Line

General information  
Place Soelden 
resort ?? 
Region Tyrol 
Country   
Name of lift Hochsölden 
Type 1-CLF 
Lift manufacturer Felix Wopfner 
Year of construction 1954 
Commissioning date 1954 
Date of closing down 15/04/12 
Date of pull down 2012 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Middle station out of order and now removed.
Since 2011 only 50% up- and downhill transportation.

geometric data  
Height of valley station 1354 m
Height of middle station(s) ?? m
Height of mountain station 2092 m
Vertical rise 738 m
Route distance 2203 m
Horizontal length ?? m
Average incline 35,80 %
Largest incline 58,00 %
Number of pillars 26 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 398 Pers/h
Travel time 16,25 min
Driving speed line 2,25 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 120 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Felix Wopfner 
Cab model ?? 
Seating polystyrene 
Seat heater no 
Persons per cab
Number of cabs 235 Stk
Cab distance 18,6 m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope 4431 m
Total weight of haul rope ?? t
Haul rope diameter 26 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 50 %
Transport downhill 50 %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 08/07/23
PHOTOS: ??

Lift-Statistics
30306 visit(s) since 24/11/02
Last visit 13/11/24

LIFT-WORLD IDs
Lift-ID: 352
Place-ID: 1

https://www.seilbahntechnik.net/en/lifts/352/datas.htm