Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  1-CLF Innerwaldlift

Mountain station by night
Mountain station by night

Pillar by night
Pillar by night

Mountain station by night
Mountain station by night

General information  
Place Soelden 
resort ?? 
Region Tyrol 
Country   
Name of lift Innerwaldlift 
Type 1-CLF 
Lift manufacturer Felix Wopfner 
Year of construction 1963 
Commissioning date ?? 
Date of closing down 2009 
Date of pull down 2009 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1360 m
Height of mountain station 1464 m
Vertical rise 104 m
Route distance 279 m
Horizontal length ?? m
Average incline 42,90 %
Largest incline 57,20 %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 710 Pers/h
Travel time 2,4 min
Driving speed line 1,9 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/01/24
PHOTOS: ??

Lift-Statistics
15845 visit(s) since 02/10/03
Last visit 26/03/24

LIFT-WORLD IDs
Lift-ID: 353
Place-ID: 1

https://www.seilbahntechnik.net/en/lifts/353/datas.htm