6-CLD/B Gifthittli


Line
Line




Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Zermatt
resort
Region Valais
Country CH Switzerland, Confoederatio Helvetica
Name of lift Gifthittli 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2003 
Commissioning date ??

geometric data  
Height of valley station 2558,4 m
Height of middle station(s) ?? m
Height of mountain station 2932,00 m
Vertical rise 373,60 m
Route distance 1836,84 m
Horizontal length ?? m
Average incline 20,4 %
Largest incline ?? %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3200 Pers/h
Travel time 6,0 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 970 kW
Drive power (Operation) 650 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Bubble colour neutral
Seating ??
Seat heater no
Persons per cab
Number of cabs 115 Stk
Cab distance 33,75 m
Cab interval 6,75 s
Garage type ground floor
Garage place mountain station
Garage direction backward
Loading direction forward

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime winter
Situation of entrance 90°
Situation of exit parallel
Loading carpet yes
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 17/05/21 16:45:46
PHOTOS: 18/05/06 21:04:00

Lift-Statistics
9206 visit(s) since 30/10/03
Last visit 22/09/21

LIFT-WORLD IDs
Lift-ID: 3593
Place-ID: 2017

https://www.seilbahntechnik.net/en/lifts/3593/datas.htm