Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Marchner

Mountain station
Mountain station

Line
Line




General information  
Place Olang / Valdaora 
resort Dolomiti Superski 
Region Trentino-South Tyrol 
Country   
Name of lift Marchner 
Type 4-CLD/B 
Lift manufacturer Agamatic 
Year of construction 1991 
Commissioning date ?? 
Date of closing down 2009 
Date of pull down ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Skydancer Chairs added 1996

geometric data  
Height of valley station 1563,6 m
Height of mountain station 2120 m
Vertical rise 556,40 m
Route distance 2031,89 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1980 Pers/h
Travel time ?? min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model Sky Dancer 
Bubble colour ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 133 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 44 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ITL
Currency (Construction costs) Italian lira 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 31/07/23
PHOTOS: ??

Lift-Statistics
13659 visit(s) since 10/01/04
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 3729
Place-ID: 1496

https://www.seilbahntechnik.net/en/lifts/3729/datas.htm