Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD Piz Seteur


Valley station
Valley station

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Sëlva
resort
Dolomiti Superski
Region , Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Piz Seteur 
Type 4-CLD 
Lift manufacturer Leitner 
Year of construction 1998 
Commissioning date 1998
Date of closing down 2017
Date of pull down 2017

geometric data  
Height of valley station 1792,7 m
Height of mountain station 2070 m
Vertical rise 277,3 m
Route distance 919,94 m
Horizontal length 866 m
Average incline ?? %
Largest incline ?? %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2200 Pers/h
Travel time ?? min
Driving speed line 4,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 360 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 83 Stk
Cab distance 24 m
Cab interval 6,0 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet yes
Evacuation ropeway no
Integrated rescue system no
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 05/11/17 18:37:18
PHOTOS: 11/06/08 17:06:00

Lift-Statistics
11890 visit(s) since 15/01/04
Last visit 19/10/21

LIFT-WORLD IDs
Lift-ID: 3741
Place-ID: 1663

https://www.seilbahntechnik.net/en/lifts/3741/datas.htm