Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD Rinneralm


Mountain station
Mountain station

Mountain station
Mountain station

Mountain station
Mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Ratschings / Racines
resort Ratschings-Jaufen

Dolomiti Superski
Region Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Rinneralm 
Type 4-CLD 
Lift manufacturer Leitner 
Year of construction 1993 
Commissioning date ??
Date of closing down ??
Date of pull down ??

geometric data  
Height of valley station 1786,6 m
Height of mountain station 2063,10 m
Vertical rise 276,45 m
Route distance 1125,71 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time ?? min
Driving speed line 4,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ??
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 100 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 16/11/15 21:53:40
PHOTOS: 01/12/07 21:46:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
8676 visit(s) since 20/02/05
Last visit 23/10/19

LIFT-WORLD IDs
Lift-ID: 3769
Place-ID: 1545

https://www.seilbahntechnik.net/en/lifts/3769/datas.htm