Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


2-CLF Marinzen


Line (2015)
Line (2015)


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Kastelruth / Castelrotto
resort
Region , Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Marinzen 
Type 2-CLF 
Lift manufacturer Doppelmayr 
Year of construction 1986 
Commissioning date 1986

geometric data  
Height of valley station 1055,2 m
Height of middle station(s) ?? m
Height of mountain station 1484,25 m
Vertical rise 429 m
Route distance 1662,37 m
Horizontal length ?? m
Average incline 26,93 %
Largest incline 68,90 %
Number of pillars 21 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 3,60 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 980 Pers/h
Travel time 12 min
Driving speed line 2,5 m/s

rope data  
Rope manufacturer Redaelli 
Length of haul rope 3336 m
Total weight of haul rope ?? t
Haul rope diameter 36 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type rope tension weight
Tension way ?? m

electrical data  
Electrical control EEI 
Remote control and telemonitoring system ??
Power control system ??
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive hydrostatic

cabins data  
Grip type ??
Cab manufacturer Doppelmayr
Cab model ??
Seating polystyrene
Seat heater no
Persons per cab
Number of cabs 182 Stk
Cab distance 18,35 m
Cab interval ?? s

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime summer
Loading carpet no
Evacuation ropeway no
Integrated rescue system ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 18/04/17 21:08:15
PHOTOS: 23/04/17 14:34:04

Lift-Statistics
4749 visit(s) since 22/04/04
Last visit 06/05/21

LIFT-WORLD IDs
Lift-ID: 3783
Place-ID: 1431

https://www.seilbahntechnik.net/en/lifts/3783/datas.htm