Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Nube d'Oro

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Madonna di Campiglio 
resort ?? 
Region Trentino-South Tyrol 
Country   
Name of lift Nube d'Oro 
Type 2-CLF 
Lift manufacturer Nascivera 
Year of construction 1969 
Commissioning date ?? 
Date of closing down 2019 
Date of pull down ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1802 m
Height of middle station(s) ?? m
Height of mountain station 2100 m
Vertical rise 298 m
Route distance 1174 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 19 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 900 Pers/h
Travel time 7,81 min
Driving speed line 2,5 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Nascivera 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/12/22
PHOTOS: ??

Lift-Statistics
9722 visit(s) since 20/02/05
Last visit 26/12/24

LIFT-WORLD IDs
Lift-ID: 3864
Place-ID: 1461

https://www.seilbahntechnik.net/en/lifts/3864/datas.htm