Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-MGD Alpen 1+2


Mountain Station
Mountain Station

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Olang / Valdaora
resort
Dolomiti Superski
Region Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Alpen 1+2 
Type 6-MGD 
Lift manufacturer Agamatic 
Year of construction 1993 
Commissioning date ??
Date of closing down ??
Date of pull down ??

geometric data  
Height of valley station 1619 m
Height of middle station(s) 1819 m
Height of mountain station 2152,5 m
Vertical rise 533,50 m
Route distance 2246,28 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 21 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 12 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Austria Draht 
Length of haul rope 4492 m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type ??
Tension way ?? m

electrical data  
Electrical control EEI 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model OMEGA 6 fl
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 119 Stk
Cab distance 15 m
Cab interval 3 s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6,5 months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 13/11/15 19:57:19
PHOTOS: 24/02/06 20:05:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
10359 visit(s) since 31/03/04
Last visit 21/10/19

LIFT-WORLD IDs
Lift-ID: 3876
Place-ID: 1496

https://www.seilbahntechnik.net/en/lifts/3876/datas.htm