Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLD/B Untermarkter Alm

Line
Line

Valley Station
Valley Station

Line
Line

General information  
Place Imst 
resort ?? 
Region Tyrol 
Country   
Name of lift Untermarkter Alm 
Type 2-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1991 
Commissioning date 1991 
Date of closing down 27/08/21 
Date of pull down 27/08/21 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Not all chairs have a Bubble.

geometric data  
Height of valley station 1053 m
Height of mountain station 1501 m
Vertical rise 447,45 m
Route distance 2299,19 m
Horizontal length 2250,1 m
Average incline 19,89 %
Largest incline 47,2 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4 m
Trackwidth return 4 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time 8,5 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Frey Austria 
Remote control and telemonitoring system Frey Austria 
Power control system Frey Austria 
Number of drive 1 Stk
Drive power (Start) 350 kW
Drive power (Operation) 269 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type DO 102 
Cab manufacturer Doppelmayr 
Cab model ?? 
Bubble colour neutral 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 175 Stk
Cab distance 27 m
Cab interval 6 s
Garage type none 
Garage place nowhere 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 4646,39 m
Total weight of haul rope ?? t
Haul rope diameter 36 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 21/03/22
PHOTOS: ??

Lift-Statistics
23243 visit(s) since 06/10/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 392
Place-ID: 146

https://www.seilbahntechnik.net/en/lifts/392/datas.htm