Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLD Alpjochbahn










General information  
Place Imst 
resort ?? 
Region Tyrol 
Country   
Name of lift Alpjochbahn 
Type 2-CLD 
Lift manufacturer Felix Wopfner 
Year of construction 1996 
Commissioning date 1996 
Date of closing down 07.03.2021 
Date of pull down 19.05.2021 
Second-hand lift. Formerly lift no. 404 


Infos for handicapped persons
Sorry, no information available.

Characteristics
second-hand Lift from Scharnitz (former Mühlberg)

geometric data  
Height of valley station 1499 m
Height of mountain station 2026 m
Vertical rise 527 m
Route distance 1521 m
Horizontal length ?? m
Average incline 31,90 %
Largest incline 37,10 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 880 Pers/h
Travel time 8,1 min
Driving speed line 4 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system Siemens 
Power control system Siemens 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive mechanical 

cabins data  
Grip type ?? 
Cab manufacturer Felix Wopfner 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 97 Stk
Cab distance ?? m
Cab interval ?? s
Garage type none 
Garage place nowhere 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23.03.2025
PHOTOS: ??

Lift-Statistics
25656 visit(s) since 06.10.2003
Last visit 05.10.2025

LIFT-WORLD IDs
Lift-ID: 393
Place-ID: 146

https://www.seilbahntechnik.net/en/lifts/393/datas.htm