Characteristics
nothing

General information  
Place Soelden
resort White 5
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Silberbrünnl 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1993 
Commissioning date ??

geometric data  
Height of valley station 2278 m
Height of mountain station 2668 m
Vertical rise 390 m
Route distance 1731 m
Horizontal length 1682,20 m
Average incline 23,10 %
Largest incline 49,50 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2650 Pers/h
Travel time 6 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Austria Draht 
Length of haul rope 3502,75 m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way 8 m

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ??
Power control system Elin 
Number of drive ?? Stk
Drive power (Start) 650 kW
Drive power (Operation) 522 kW
Brake power 419 kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type DT 104
Cab manufacturer Doppelmayr
Cab model 4E95/B
Bubble colour neutral
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 144 Stk
Cab distance 24,5 m
Cab interval 5,4 s
Garage type ground floor
Garage place valley station
Garage direction forward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 4 months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) C 35 




This information are for members only visible!



Updates
Datas: 03/05/15 18:50:04
PHOTOS: 19/12/03 15:54:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
12107 visit(s) since 23/11/02
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 4
Place-ID: 1

https://www.seilbahntechnik.net/en/lifts/4/datas.htm