  2-CLF Gipfelbahn

Peak lift with panorama
Peak lift with panorama

General information  
Place Mitterbach am Erlaufsee 
resort Schilifte Josefsberg auf dem Alpl 
Region Lower Austria 
Country   
Name of lift Gipfelbahn 
Type 2-CLF 
Lift manufacturer Doppelmayr 
Year of construction 2003 
Commissioning date 12 / 2003 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1296 m
Height of mountain station 1626 m
Vertical rise 330 m
Route distance 976 m
Horizontal length 910 m
Average incline 36,2 %
Largest incline 69,9 %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1006 Pers/h
Travel time 6,8 min
Driving speed line 2,4 m/s

electrical data  
Electrical control Frey Austria 
Remote control and telemonitoring system Frey Austria 
Power control system Frey Austria 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating polystyrene 
Seat heater no 
Persons per cab
Number of cabs 115 Stk
Cab distance 17,2 m
Cab interval 7,2 s


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 2080 m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 70 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime ❄ ☀ all-season 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/03/24
PHOTOS: ??

Lift-Statistics
8418 visit(s) since 26/04/04
Last visit 05/12/24

LIFT-WORLD IDs
Lift-ID: 4063
Place-ID: 494