Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-MGD Plattières 2


Middle Station
Middle Station

Middle Station
Middle Station

Middle Station
Middle Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Méribel-Mottaret
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Plattières 2 
Type 6-MGD 
Lift manufacturer Poma 
Year of construction 1983 
Commissioning date 1983
Date of closing down 2012
Date of pull down 2012

geometric data  
Height of valley station 2017 m
Height of mountain station 2414 m
Vertical rise 397 m
Route distance 2113 m
Horizontal length ?? m
Average incline 20 %
Largest incline 52 %
Number of pillars 23 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2200 Pers/h
Travel time 7,03 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 490 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Sigma
Cab model ??
Seating ??
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 102 Stk
Cab distance 50 m
Cab interval 10 s
Garage type ground floor
Garage place in all stations
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 04/01/17 14:00:13
PHOTOS: 29/12/05 17:24:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
6815 visit(s) since 19/03/05
Last visit 15/09/19

LIFT-WORLD IDs
Lift-ID: 4074
Place-ID: 1131

https://www.seilbahntechnik.net/en/lifts/4074/datas.htm