Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-MGD Plattières 3


Middle Station
Middle Station

Line
Line

Mountain station
Mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Méribel-Mottaret
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Plattières 3 
Type 6-MGD 
Lift manufacturer Poma 
Year of construction 1984 
Commissioning date 1984

geometric data  
Height of valley station 2414 m
Height of mountain station 2709 m
Vertical rise 295 m
Route distance 741 m
Horizontal length ?? m
Average incline 43 %
Largest incline 68 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2200 Pers/h
Travel time 2,47 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 358 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type Omega TL
Cab manufacturer Sigma
Cab model ??
Seating ??
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 50 Stk
Cab distance 50 m
Cab interval 10 s
Garage type station circulation
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 04/01/17 14:11:36
PHOTOS: 29/12/05 17:27:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
8954 visit(s) since 19/03/05
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 4075
Place-ID: 1131

https://www.seilbahntechnik.net/en/lifts/4075/datas.htm